1. 2014
  2. Current state of automated design tools for increasing availability of data early in the ship design process

    Rose, CD. & Coenen, JMG., 2014, Proceedings of 2014 the International Conference on Maritime Technology. Incecik, A., Zhou, P. & Turan, O. (eds.). Glasgow, UK: ICNAME, p. 1-8 8 p.

    Research output: Chapter in Book/Report/Conference proceedingConference contributionScientificpeer-review

  3. Effective use of 'underwater' planning tricks in complicated engineering networks?

    Coenen, JMG., 2014, Proceedings of the 10th International Symposium on Tools and Methods of Competitive Engineering (TMCE). Horvath, I. & Rusak, Z. (eds.). Delft, The Netherlands: Delft University of Technology, p. 131-144 14 p.

    Research output: Chapter in Book/Report/Conference proceedingConference contributionScientificpeer-review

  4. 2012
  5. Development, implementation and testing of a 3d information viewer in shipbuilding

    Asmara, A., Coenen, JMG., van Loenen, GM. & Berge, E., 2012, 11th international marine design conference imdc2012. imdc2012 secretariat (ed.). glasgow, uk: imdc2012 secretariat, p. 437-448 12 p.

    Research output: Chapter in Book/Report/Conference proceedingConference contributionScientificpeer-review

  6. 2010
  7. Approximate orthogonal simplification of 3d model

    Asmara, A., Nienhuis, U. & Hekkenberg, R. G., 2010, Wcci 2010. s.n. (ed.). Piscataway, nj, usa: IEEE Society, p. 1170-1173 4 p.

    Research output: Chapter in Book/Report/Conference proceedingConference contributionScientificpeer-review

  8. Nieuwe cgt-waarden voor superjachten

    Hekkenberg, R. G., Pruyn, JFJ. & van Hooren, CM., 2010, In : SWZ Maritime. 131, 7/8, p. 16-17 2 p.

    Research output: Contribution to journalArticleProfessional

  9. Two approaches to scheduling outfitting processes in shipbuilding

    Wei, Y., Nienhuis, U. & Moredo, E., 2010, In : Journal of Ship Production. 26, 1, p. 20-28 9 p.

    Research output: Contribution to journalArticleScientificpeer-review

  10. 2009
  11. An automatic schedule generation system of outfitting process in shipbuilding

    Wei, Y. & Nienhuis, U., 2009, International conference on computer applications in shipbuilding 2009. s.n. (ed.). London: The royal institution of naval architects, p. 199-207 9 p.

    Research output: Chapter in Book/Report/Conference proceedingConference contributionScientific

  12. Model and evaluation technique for engineering-to-order processes in shipbuilding

    Coenen, JMG. & Hekkenberg, R. G., 2009, 8th international conference on computer and it applications in the maritime industries compit '09. Bertram, V. (ed.). Germany: Tu tech gmbh, p. 91-106 16 p.

    Research output: Chapter in Book/Report/Conference proceedingConference contributionScientific

  13. Two approaches to scheduling outfitting processes in shipbuilding

    Wei, Y., Nienhuis, U. & Moredo, E., 2009, sname 2009. s.n. (ed.). Madison: Omnipress, p. 1-13 13 p.

    Research output: Chapter in Book/Report/Conference proceedingConference contributionScientific

  14. 2008
  15. Controlling engineering to order processes in shipbuilding a model based approach

    Coenen, JMG., 2008, 196 p.

    Research output: ThesisDissertation (TU Delft)Scientific

Previous 1 2 3 4 5 6 7 8 ...16 Next

ID: 295951