1. 2020
  2. Design Models for Single Patient Rooms Tested for Patient Preferences

    van Oel, C. J., Mlihi, M. & Freeke, A., 14 Jul 2020, In : Health Environments Research and Design Journal. 16 p.

    Research output: Contribution to journalArticleScientificpeer-review

  3. Perception of privacy in a university building: The transparency paradox

    Bentinck, S. A., van Oel, C. J. & van Dorst, M. J., 11 Apr 2020, (Accepted/In press) In : Frontiers of Architectural Research.

    Research output: Contribution to journalArticleScientificpeer-review

  4. No-Blame Culture and the Effectiveness of Project-Based Design Teams in the Construction Industry: The Mediating Role of Teamwork

    Koolwijk, J., van Oel, C. & Gaviria Moreno, J. C., 2020, In : Journal of Management in Engineering. 36, 4, 13 p., 04020033.

    Research output: Contribution to journalArticleScientificpeer-review

  5. The Total Cost of Living in Relation to Energy Efficiency Upgrades in the Dutch, Multi-Residential Building Stock

    Konstantinou, T., de Jonge, T., Oorschot, L. M., El Messlaki, S., van Oel, C. J. & Asselbergs, M. F., 2020, Smart and Sustainable Cities and Buildings. Roggema, R. & Roggema, A. (eds.). Cham, Switzerland: Springer, p. 379-390 12 p.

    Research output: Chapter in Book/Conference proceedings/Edited volumeConference contributionScientificpeer-review

  6. 2019
  7. The relation of energy efficiency upgrades and cost of living, investigated in two cases of multi-residential buildings in the Netherlands

    Konstantinou, T., de Jonge, T., Oorschot, L., El Messlaki, S., van Oel, C. & Asselbergs, T., 2 Dec 2019, In : Smart and Sustainable Built Environment.

    Research output: Contribution to journalArticleScientificpeer-review

  8. Organising and Managing boundaries: A structurational view of collaboration with Building Information Modelling (BIM)

    Papadonikolaki, E., van Oel, C. & Kagioglou, M., 2019, In : International Journal of Project Management. 37, 3, p. 378-394 17 p.

    Research output: Contribution to journalArticleScientificpeer-review

  9. 2018
  10. Collaboration and Integration in Project-Based Supply Chains in the Construction Industry

    Koolwijk, J., van Oel, C., Wamelink, H. & Vrijhoef, R., 17 Jan 2018, In : Journal of Management in Engineering. 34, 3, 14 p., 04018001.

    Research output: Contribution to journalArticleScientificpeer-review

  11. 2016
  12. Is it faster and is that Measurable: A Quantitative Research Into the Time Effects of Integrated Contract Forms in Development Processes

    Akbarian, B., Prins, M. & van Oel, C., 2016, Proceedings of the CIB World Building Congress 2016: Volume II, Environmental Opportunities and Challenges; Constructing Commitment and Acknowledging Human Experience. Prins, M., Wamelink, H., Giddings, B., Ku, K. & Feenstra, M. (eds.). Tampere University of Technology, p. 510-522 (Tampere University of Technology. Department of Civil Engineering. Construction Management and Economics. Report; vol. 18).

    Research output: Chapter in Book/Conference proceedings/Edited volumeConference contributionScientificpeer-review

Previous 1 2 3 4 5 6 Next

ID: 116598