1. 2019
  2. Simulation-based optimization approach for material dispatching in continuous mining systems

    Shishvan, M. S. & Benndorf, J., 16 Jun 2019, In : European Journal of Operational Research. 275, 3, p. 1108-1125 18 p.

    Research output: Contribution to journalArticleScientificpeer-review

  3. 2018
  4. Sensor Based Real-Time Resource Model Reconciliation for Improved Mine Production Control-A Conceptual Framework

    Benndorf, J., Buxton, M. & Shishvan, M. S., 17 Jan 2018, Advances in Applied Strategic Mine Planning. Springer International Publishing, p. 725-744 20 p.

    Research output: Chapter in Book/Report/Conference proceedingChapterScientific

  5. Value of Information Introduced by a Resource Model Updating Framework

    Yüksel, C., Minnecker, C., Shishvan, M. S., Benndorf, J. & Buxton, M., 1 Jan 2018, In : Mathematical Geosciences. 19 p.

    Research output: Contribution to journalArticleScientificpeer-review

  6. A Study of the Influence of Measurement Volume, Blending Ratios and Sensor Precision on Real-Time Reconciliation of Grade Control Models

    Wambeke, T. & Benndorf, J., 2018, In : Mathematical Geosciences. 50, 7, p. 801-826 26 p.

    Research output: Contribution to journalArticleScientificpeer-review

  7. Real-time reconciliation of a geometallurgical model based on ball mill performance measurements–a pilot study at the Tropicana gold mine

    Wambeke, T., Elder, D., Miller, A., Benndorf, J. & Peattie, R., 2018, In : Mining Technology: Transactions of the Institute of Mining and Metallurgy. 127, 3, p. 115-130 16 p.

    Research output: Contribution to journalArticleScientificpeer-review

  8. 2017
  9. Operational decision support for material management in continuous mining systems: From simulation concept to practical full-scale implementations

    Shishvan, M. S. & Benndorf, J., 1 Jul 2017, In : Minerals - Open Access Mining & Mineral Processing Journal. 7, 7, 26 p., 116.

    Research output: Contribution to journalArticleScientificpeer-review

  10. Updating the coal quality parameters in multiple production benches based on combined material measurement: a full case study

    Yüksel, C., Benndorf, J., Lindig, M. & Lohsträter, O., 1 Jun 2017, In : International Journal of Coal Science and Technology. 4, 2, p. 159-171 13 p.

    Research output: Contribution to journalArticleScientificpeer-review

  11. Recent Developments in Closed-Loop Approaches for Real-Time Mining and Petroleum Extraction

    Benndorf, J. & Jansen, J. D., 2 Jan 2017, In : Mathematical Geosciences. 49, 3, p. 277–306 30 p.

    Research output: Contribution to journalArticleScientificpeer-review

  12. A Simulation-Based Geostatistical Approach to Real-Time Reconciliation of the Grade Control Model

    Wambeke, T. & Benndorf, J., 1 Jan 2017, In : Mathematical Geosciences. 49, 1, p. 1–37

    Research output: Contribution to journalArticleScientificpeer-review

  13. Performance analysis of continuous resource model updating in lignite production

    Yüksel, C. & Benndorf, J., 2017, Geostatistics Valencia 2016: 10th International Geostatistical Congress. Gomez-Hernandez, J. J., Rodrigo-Clavero, M. E., Vargas-Guzman, J. A., Rodrigo-Ilarri, J. & Cassiraga, E. (eds.). Springer, p. 431-446 (Quantitative Geology and Geostatistics, QGAG; vol. 19).

    Research output: Chapter in Book/Report/Conference proceedingConference contributionScientificpeer-review

Previous 1 2 3 4 5 6 Next

ID: 116053