Abstract
In this paper, we propose a method to analyze the amount of operation reserves procured in a system based on two stages. The first stage is a detailed hourly unit commitment and the second stage is a simulation model with a shorter time period. The method is applied to the Spanish hydrothermal system and several cases are analyzed to determine the impact of the time period in the use of the operation reserves.
Original language | English |
---|---|
Title of host publication | 13th International Conference on the European Energy Market (EEM 2016) |
Place of Publication | Danvers, MA, USA |
Publisher | IEEE Society |
Pages | 1-5 |
Number of pages | 5 |
ISBN (Electronic) | 978-1-5090-1298-5 |
ISBN (Print) | 978-1-5090-1297-8 |
DOIs | |
Publication status | Published - 28 Jul 2016 |
Event | 13th International Conference on the European Energy Market, EEM 2016 - Porto, Portugal Duration: 6 Jun 2016 → 9 Jun 2016 |
Conference
Conference | 13th International Conference on the European Energy Market, EEM 2016 |
---|---|
Country/Territory | Portugal |
City | Porto |
Period | 6/06/16 → 9/06/16 |
Bibliographical note
Accepted Author ManuscriptKeywords
- wind power uncertainty
- Mixed-integer programming
- operating researves
- unit commitment
- economic dispatch