Original language | English |
---|---|
Pages (from-to) | 49-56 |
Number of pages | 8 |
Journal | Transport Policy |
Volume | 22 |
DOIs | |
Publication status | Published - 2012 |
Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases
CC Cantarelli, EJE Molin, GP van Wee, B Flyvbjerg
Research output: Contribution to journal › Article › Scientific › peer-review
98
Citations
(Scopus)