Abstract
This paper discusses and compares two approaches to address technical challenges in performing collaborative studies of power system dynamics. On one side, we consider the model migration approach which is an essential piece of dynamic model exchange. On the other side, we look at the co-simulation approach which is used to couple simulation tools together. The approaches are compared in terms of accuracy and the most probable reasons for discrepancy between dynamic responses are discussed. We complement the discussion and conclusions with the simulation results on a simple test system.
Original language | English |
---|---|
Title of host publication | Proceedings - 16th Wind Integration Workshop |
Subtitle of host publication | International Workshop on Large-Scale Integration of Wind Power into Power Systems as well as on Transmission Networks for Offshore Wind Power Plants |
Editors | Uta Betancourt, Thomas Ackermann |
Place of Publication | Darmstadt |
Publisher | Energynautics GmbH |
ISBN (Electronic) | 978-3-9816549-6-7 |
Publication status | Published - Oct 2017 |
Event | 16th Wind Integration Workshop - Berlin, Germany Duration: 25 Oct 2017 → 27 Oct 2017 Conference number: 16 |
Conference
Conference | 16th Wind Integration Workshop |
---|---|
Country/Territory | Germany |
City | Berlin |
Period | 25/10/17 → 27/10/17 |