Standard

Effects of dam operation on downstream river morphology: the case of the middle Zambezi River. / Khan, O; Mwelwa-Mutekenya, E; Crosato, A; Zhou, Y.

In: Proceedings of the Institution of Civil Engineers - Water Management, Vol. 167, No. 10, 2014, p. 585-600.

Research output: Contribution to journalArticleScientificpeer-review

Harvard

Khan, O, Mwelwa-Mutekenya, E, Crosato, A & Zhou, Y 2014, 'Effects of dam operation on downstream river morphology: the case of the middle Zambezi River' Proceedings of the Institution of Civil Engineers - Water Management, vol. 167, no. 10, pp. 585-600. https://doi.org/10.1680/wama.13.00122

APA

Khan, O., Mwelwa-Mutekenya, E., Crosato, A., & Zhou, Y. (2014). Effects of dam operation on downstream river morphology: the case of the middle Zambezi River. Proceedings of the Institution of Civil Engineers - Water Management, 167(10), 585-600. https://doi.org/10.1680/wama.13.00122

Vancouver

Khan O, Mwelwa-Mutekenya E, Crosato A, Zhou Y. Effects of dam operation on downstream river morphology: the case of the middle Zambezi River. Proceedings of the Institution of Civil Engineers - Water Management. 2014;167(10):585-600. https://doi.org/10.1680/wama.13.00122

Author

Khan, O ; Mwelwa-Mutekenya, E ; Crosato, A ; Zhou, Y. / Effects of dam operation on downstream river morphology: the case of the middle Zambezi River. In: Proceedings of the Institution of Civil Engineers - Water Management. 2014 ; Vol. 167, No. 10. pp. 585-600.

BibTeX

@article{2416892ca596480b844d4d07073dcdde,
title = "Effects of dam operation on downstream river morphology: the case of the middle Zambezi River",
keywords = "CWTS JFIS < 0.75",
author = "O Khan and E Mwelwa-Mutekenya and A Crosato and Y Zhou",
note = "Harvest Available online",
year = "2014",
doi = "10.1680/wama.13.00122",
language = "English",
volume = "167",
pages = "585--600",
journal = "Proceedings of the Institution of Civil Engineers - Water Management",
issn = "1741-7589",
publisher = "ICE Publishing Ltd.",
number = "10",

}

RIS

TY - JOUR

T1 - Effects of dam operation on downstream river morphology: the case of the middle Zambezi River

AU - Khan, O

AU - Mwelwa-Mutekenya, E

AU - Crosato, A

AU - Zhou, Y

N1 - Harvest Available online

PY - 2014

Y1 - 2014

KW - CWTS JFIS < 0.75

U2 - 10.1680/wama.13.00122

DO - 10.1680/wama.13.00122

M3 - Article

VL - 167

SP - 585

EP - 600

JO - Proceedings of the Institution of Civil Engineers - Water Management

T2 - Proceedings of the Institution of Civil Engineers - Water Management

JF - Proceedings of the Institution of Civil Engineers - Water Management

SN - 1741-7589

IS - 10

ER -

ID: 1239563