Integrated busbar protection scheme based on IEC61850-9-2 proces bus concept

I Xyngi, M Popov

    Research output: Chapter in Book/Conference proceedings/Edited volumeConference contributionScientificpeer-review

    Abstract

    The integration of distributed generation transforms current distribution networks from vertically operated to horizontally operated. This transition leads to problems related to protection coordination. In the future, new protection philosophies should be applied which guarantee the increase of the during-fault distributed generation availability. The paper presents a protection scheme based on fault transient analysis. It also explicitly describes the concept of integrated protection unit and the IEC61850-9-2 process bus concept. The effectiveness of the protection principle is tested for a converter based doubly fed induction generator wind turbine. Simulation results reveal proper operation of the protection scheme in the case of not sustained fault current contribution.
    Original languageEnglish
    Title of host publication2010 IEEE Power and Energy Society General Meeting
    Place of PublicationMinneapolis
    PublisherIEEE Society
    Pages1-6
    Number of pages6
    ISBN (Print)978-1-4244-6549-1
    Publication statusPublished - 2010
    EventIEEE Power and Energy Society General Meeting, PESGM 2010: The Global Forum for Power and Energy Professionals - Minneapolis, MN, United States
    Duration: 25 Jul 201029 Jul 2010

    Conference

    ConferenceIEEE Power and Energy Society General Meeting, PESGM 2010
    Country/TerritoryUnited States
    CityMinneapolis, MN
    Period25/07/1029/07/10

    Keywords

    • conference contrib. refereed
    • Conf.proc. > 3 pag

    Fingerprint

    Dive into the research topics of 'Integrated busbar protection scheme based on IEC61850-9-2 proces bus concept'. Together they form a unique fingerprint.

    Cite this