Documents

DOI

This paper presents a research endeavouring to model site work in a 4D BIM model. Next simulations are performed with this model in 5 scenarios including specific interventions in work organisation, notably changing positons of facilities for site workers. A case study has been done in a construction project in the Netherlands. The research has showed the possibility to model time use of site workers in 4D BIM. Next the research has showed potential to perform and calculate specific interventions in the model, and prospect realistic changes in productive time use as a result.
Original languageEnglish
Title of host publicationProceedings of the 26th Annual Conference of the International Group for Lean Construction (IGLC 2018)
EditorsVicente Gonzalez
PublisherIGLC (International Group for Lean Construction)
Pages155-165
DOIs
Publication statusPublished - 2018
EventIGLC 2018: 26th Annual Conference of the International Group for Lean Construction - Chennai, India
Duration: 16 Jul 201820 Jul 2018

Conference

ConferenceIGLC 2018: 26th Annual Conference of the International Group for Lean Construction
CountryIndia
CityChennai
Period16/07/1820/07/18

    Research areas

  • BIM, time use, simulation, site work, labour optimisation

ID: 51450471