Scheduling under uncertainty : Attaining flexibility, robustness and stability. / Mountakis, Kiriakos Simon .

2018. 121 p.

Research output: ScientificDissertation (TU Delft)

Harvard

APA

Vancouver

Author

BibTeX

@phdthesis{4e63aefa04cf4a63a5b0e48d6e227390,
title = "Scheduling under uncertainty: Attaining flexibility, robustness and stability",
abstract = "The research presented in this thesis is part of the Rolling Stock Life Cycle Logistics applied research and development program, conducted by NedTrain. As a company, NedTrain belongs to Nederlandse Spoorwegen (NS; the principal railway company in the Netherlands) and provides maintenance services for the NS train-fleet. The aim of this program is to enhance NedTrain’s competitiveness as a rolling-stock maintenance services provider. Our work focuses on the operational aspects of this R&D program, motivated by the challenge of scheduling tasks (or operations) in a NedTrain maintenance workshop, such that trains are delivered on-time for circulation in the rail network. Most tasks in the workshop have uncertain durations (or processing times), which complicates the scheduling process.",
keywords = "simple temporal network, flexibility, robustness, stability, scheduling under encertainty, resource constrained project scheduling, monte carlo sampling",
author = "Mountakis, {Kiriakos Simon}",
year = "2018",
doi = "10.4233/uuid:4e63aefa-04cf-4a63-a5b0-e48d6e227390",
school = "Delft University of Technology",

}

RIS

TY - THES

T1 - Scheduling under uncertainty

T2 - Attaining flexibility, robustness and stability

AU - Mountakis,Kiriakos Simon

PY - 2018

Y1 - 2018

N2 - The research presented in this thesis is part of the Rolling Stock Life Cycle Logistics applied research and development program, conducted by NedTrain. As a company, NedTrain belongs to Nederlandse Spoorwegen (NS; the principal railway company in the Netherlands) and provides maintenance services for the NS train-fleet. The aim of this program is to enhance NedTrain’s competitiveness as a rolling-stock maintenance services provider. Our work focuses on the operational aspects of this R&D program, motivated by the challenge of scheduling tasks (or operations) in a NedTrain maintenance workshop, such that trains are delivered on-time for circulation in the rail network. Most tasks in the workshop have uncertain durations (or processing times), which complicates the scheduling process.

AB - The research presented in this thesis is part of the Rolling Stock Life Cycle Logistics applied research and development program, conducted by NedTrain. As a company, NedTrain belongs to Nederlandse Spoorwegen (NS; the principal railway company in the Netherlands) and provides maintenance services for the NS train-fleet. The aim of this program is to enhance NedTrain’s competitiveness as a rolling-stock maintenance services provider. Our work focuses on the operational aspects of this R&D program, motivated by the challenge of scheduling tasks (or operations) in a NedTrain maintenance workshop, such that trains are delivered on-time for circulation in the rail network. Most tasks in the workshop have uncertain durations (or processing times), which complicates the scheduling process.

KW - simple temporal network

KW - flexibility

KW - robustness

KW - stability

KW - scheduling under encertainty

KW - resource constrained project scheduling

KW - monte carlo sampling

UR - http://resolver.tudelft.nl/uuid:4e63aefa-04cf-4a63-a5b0-e48d6e227390

U2 - 10.4233/uuid:4e63aefa-04cf-4a63-a5b0-e48d6e227390

DO - 10.4233/uuid:4e63aefa-04cf-4a63-a5b0-e48d6e227390

M3 - Dissertation (TU Delft)

ER -

ID: 39918363