Abstract
Simulations are the core of every railway system. Changes in the timetable and the infrastructure, or even in the internal processes of a railway company should be, and usually are, first tested through simulations. Given their significance and potential impact, simulations should be primarily validated; validation ensures-at least to some extent-that the returned results are credible and can be used for the intended purpose. This study is a detailed report on two case studies from the railway sector. The aim of this paper is to identify critical factors that can advance or hinder the validity and the effective usage of simulation models.
Original language | English |
---|---|
Pages (from-to) | 346-364 |
Number of pages | 19 |
Journal | International Journal of System of Systems Engineering |
Volume | 8 |
Issue number | 4 |
DOIs | |
Publication status | Published - 2018 |
Bibliographical note
Green Open Access added to TU Delft Institutional Repository ‘You share, we take care!’ – Taverne project https://www.openaccess.nl/en/you-share-we-take-care Otherwise as indicated in the copyright section: the publisher is the copyright holder of this work and the author uses the Dutch legislation to make this work public.Keywords
- Case study
- Railways
- Simulations
- Validation